- ERP Name
- Type in the Name of this Emergency Response Plan.
- Category
- Click on the Category drop-down list to select the ERP category.
Both the Operational and Supplemental categories can have supplements and only the Supplemental category can be used to submit a supplemental plan.
- Proximity to Urban Centre (in KM)
- Type in the distance, in kilometres, to the nearest urban centre in the Proximity to Urban Centre field. The name of the urban centre must also be typed into the Name of Urban Centre field.
This field only accepts a distance that is less than 10000 km. If this is not enough, add a comment in the Comments field stating that the Proximity to Urban Centre is and the actual distance.
- Size of EPZ
- Type in the size, in kilometres, of the drilling EPZ or the largest EPZ in a production ERP in the Size of EPZ field.
This field only accepts a distance that is less than 1000.00 km. If this is not enough, add a comment in the Comments field stating that the Size of EPZ is and the actual distance.
- Max. H2S Release Rate
- Type in the maximum rate at which H2S can be released during an incident in the Max. H2S Release Rate field. The release rate is in m3/s.
This field only accepts a rate that is less than 10000.0000 m3.s. If this is not enough, add a comment in the Comments field stating that the Max. H2S Release Rate is and the actual rate.
- Max. H2S%
- Type in the highest concentration of H2S, as a percent, in the Max. H2S% field.
|
- Primary ERP Plan Ref #
- Type is the Reference number for the Primary ERP in the Primary ERP Plan Ref # field and press Enter. This is only required if the plan you are registering is a supplement to an existing plan. Alternatively, click on the Search button and use the ERP Number advanced Search screen to locate the ERP. Both Operational and Supplemental type plans can have supplemental plans.
When the Ref # is verified, the ERP Name and Operator Id are shown.
- Plan Type
- Click on the Plan Type drop-down list to select the ERP plan type.
- HSC: (Hydrocarbon Storage Cavern) This is applicable for both new and existing operations.
- For new operations: Use this for storage facilities or pipelines that require a specific ERP.
These require that the ERP be reviewed and approves before operations begin.
- for existing operations: Use this for storage facilities or pipelines that are already in production and require an ERP because of a licensee changes (purchase, transfer, merger,...) or that have an ERP that requires major revisions. Major revisions can include significant changes to the EPZ or significant changes in the roles, responsibilities, or procedures.
These require review and approval.
- HVP: (High Vapor Pressure) This is applicable for both new and executing operations.
- For new operations: Use this for pipelines or facilities that require a specific ERP.
These require that the ERP be reviewed and approves before operations begin.
- For existing operations: Use this when the operations are on production but an ERP is now required due to a licensee change (purchase, transfer, merger,...) occurred.
These require review and approval.
- Sour Prod: (Sour Production ERP) Use this for new and existing sour production gathering systems including well, pipelines, facilities and any other operations requiring a specific ERP.
- For new operations: Use this for any sour production gathering system, including wells, pipelines, and/or facilities; any operation that requires a specific ERP.
These require that the ERP be reviewed and approved before operations begin.
- For existing operations: Use this when the gathering system is already in production and require an ERP because of a licensee changes (purchase, transfer, merger,...) or when the ERP requires major revisions. Major revisions can inlcude significant changes to the EPZ or significant changes in the roles, responsibilities, or procedures.
These require review and approval.
- Sour Well Crit: (Sour Well Critical) Use this for critical sour wells undergoing drilling, completion, workover, testing, or re-entry operations.
These require review and approval before spud/operations begin.
- Sour Well NonCrit: (Sour Well Noncritical) Use this for non-critical sour wells undergoing drilling, completion, workover, testing, or re-entry operations.
These require review and approval before spud/operations begin.
- Operating Area Supp: (Operating Area Supplement) Use this for newly purchased operations or new area operations to become part of a multi-area sour production ERP or HVP ERP.
- Newly purchased operations require Operating Area Supplements when they are to be tied-in to existing approved sour production or HVP ERPs.
These require review and approval.
- New area operations that are to become part of a multi-area HVP or source production ERP require Operating Area Supplements.
These require review and approval prior to commencement of operations.
- Tie-In Supp: (Tie-In supplement) Use this for new drilling and construction that is not on production or to tie-in the results of an additional surface development into an existing approved sour production ERP.
These require review and approval prior to commencement of operations.
- Sour Well Supp: (Sour Well Supplement) Use this for drilling, completion, workover, or testing of a sour well within an existing sour production EPZ with surface developments within the well EPZ.
These require review and approval prior to spud/commencement of operations.
- Name of Urban Centre
- Type in the name of the nearest urban centre in the Name of Urban Centre field. The distance to the urban centre must also be typed into the Proximity to Urban Centre field.
- Total # of surface developments
- Type in the number of surface developments in the Total # Surface Developments field.
This field only accepts a number that is less than 10000. If this is not enough, add a comment in the Comments field stating that the Total # of surface developments is and the actual number.
- Max. H2S Release Volume
- Type in the maximum volume of H2S that can be released during an incident in the Max. H2S Release Volume field. This volume should be in m3.
This field only accepts a volume that is less than 1000.00 m3. If this is not enough, add a comment in the Comments field stating that the Max. H2S Release Volume is and the actual volume.
- Surface Location
- Type in the Legal Subdivision (LSD), Section (SEC), Township (TWP), Range (RG), and Meridian (M) for the surface location. If this is a production facility ERP, use the location of the main facility. If there are no facilities, use the location of a well within the gathering system or the location of a pipeline.
|