Default

Logo.JPG

LINE3.GIF (2813 bytes)
Integrated Application Registry
LINE3.GIF (2813 bytes)

  Application Query
Help 
Application Type:
Attachment Type: Attachment Description:
Date Range:
From:
Click here to select a date.
To:
Click here to select a date.
Application Type
Attachment Type
Attachment Description
Date
Size
(1) E600ACD InformationDocumentation demonstrating Alberta Community Development has granted clearance.25-Oct-20181020.65 KB
(1) E600AENV RequirementsDescription of SO2/NOx exceedences. Schematic diagram or description of stack. Input parameters and the predicted normal maximum ground-level concentration for SO2 and NOx modeling. Name of the dispersion model used. Breakdown of all sources of SO2/NOx.26-Oct-201818.91 KB
(1) E600AENV RequirementsDescription of SO2/NOx exceedences. Schematic diagram or description of stack. Input parameters and the predicted normal maximum ground-level concentration for SO2 and NOx modeling. Name of the dispersion model used. Breakdown of all sources of SO2/NOx.26-Oct-201825.45 KB
(1) E600Application FormsApplication documents containing background and technical information for review by the AER.26-Oct-201834.9 KB
(1) E600Cover LetterApplication cover letter26-Oct-20183.87 MB
(1) E600CSA Standards InformationDescription of how the CSA requirements have been met26-Oct-2018163.15 KB
(1) E600Disposition DocumentDisposition documents in the form of an Approval, Order or Permit & Licence.31-Oct-201979.75 KB
(1) E600Environmental RequirementsIf mitigation measures are necessary to protect the environment, the licensee must submit documentation outlining the steps that will be taken to ensure the protection of the environment and that all AER requirements are met.26-Oct-201822.08 KB
(1) E600Manufacturers SpecificationsManufacturer specifications to confirm emission ratings, type of driver, and size of compressor/pump26-Oct-201819.54 KB
(1) E600Material BalanceWritten description of the proposed process at the facility. An explanation of any differences between design rates applied for and those from the material balance.26-Oct-201816.83 KB
(1) E600Material BalanceWritten description of the proposed process at the facility. An explanation of any differences between design rates applied for and those from the material balance.26-Oct-201838.28 KB
(1) E600Miscellaneous (Ext)ACO Adeq Assessment Decision 2019-10-25 10-35-3925-Oct-2019107.99 KB
(1) E600Miscellaneous (Ext)Pembina SIR#1 Response - Proliferation Only20-Feb-20191.54 MB
AllMiscellaneous (Int)SOCD Letter27-Feb-2019217.99 KB
(1) E600Noise Impact AssessmentA copy of the noise impact assessment.26-Oct-20182.22 MB
(1) E600Plot PlanSite specific plot plan26-Oct-2018750.06 KB
(1) E600Process Flow DiagramProcess flow diagram.26-Oct-20182.36 MB
(1) E600Production Measurement InfoA list and location of each meter proposed. Documentation to confirm that the measurement/estimation procedures for flared, incinerated, and vented volumes meet the requirements of Directive 060.26-Oct-20181.13 MB
(1) E600Proliferation InformationFor new Category C300, D400, and E600 plants, the results of the feasibility evaluation of existing plants26-Oct-20182.12 MB
(1) E600Sour Setback InformationInput parameters used to calculate the highest level of Category D pipeline associated with the facility. Pipeline licence and line number for the pipeline that determined the required setback. Pipeline map showing ESD and check valve locations.26-Oct-201882.82 KB
(1) E600Storage Requirements InfoSize and type of storage tank(s) proposed. Description of design and construction, leak detection, secondary containment, and weather protection for each tank proposed.26-Oct-201848.37 KB
(1) E600Substance AnalysisWellhead or inlet analysis representative of facility inlet26-Oct-2018185.71 KB
(1) E600Sulphur Recovery RequirementsExplanation of how the facility meets the current sulphur recovery requirements26-Oct-201871.44 KB
(1) E600Total Cont Emission RatesBreakdown of NOx, CO2, and continuous sulphur emission sources. For facilities with NOx emissions < 16 kg/h, the input parameters and predicted normal and maximum ground-level concentration of NOx. A copy of the AENV approval or registration number.26-Oct-2018419.93 KB
(1) E600Vapour Recovery InformationFor facilities with H2S > 10 mol/kmol, a description of the method to handle stock tank vapours. For Category C, D, and E facilities, a description of how off-lease odours will be controlled during the transfer and transport of fluids containing H2S.26-Oct-201826.07 KB
(1) E600Consultation and NotificationDetailed explanation why consultation and notification requirements have not been met, including a chronology of the Participant Involvement Program, and a discussion of mitigative measures taken.26-Oct-201872.81 KB
AllCorrespondence to Objector31374 - AER to SemCAMS - SOC Registration Letter - 2018-11-2929-Nov-20182.11 MB
AllCorrespondence to Objector31374 - AER to SemCAMS - SOC Disposition - 2019-02-2727-Feb-2019239.51 KB
(1) E600Emergency Response PlanA statement of confirmation that a corporate or specific plan has been submitted to AER Operations in accordance with Directive 071 and, if applicable, submit a copy of a preapproved EPZ issued by AER Emmergency Planning & Assessment.26-Oct-201822.45 KB
AllLetters of Objection31374 - SemCAMS to Pembina - SOC -2018-11-2829-Nov-20181.9 MB
(1) E600Letters of ObjectionA written submission, received manually, that states objection to the submission.26-Oct-201819.68 KB
(1) E600OS Objections (Ext)Detailed summary of public/industry consultation program explaining all outstanding objections and/or concerns and attempts towards reconciliation.26-Oct-201817.89 KB
(1) E600P.I. Investigation MapA map that details the radius of investigation for the Participant Involvement requirements.26-Oct-20185.93 MB
(1) E600Participant Involvement Pkg5.10.2.2_PI Summary_Industry Notifications_non-redacted09-Apr-20193.86 MB
(1) E600Participant Involvement Pkg5.10.2.3B_PI Summary_Residents with egress through the EPZ_non-redacted09-Apr-20191.82 MB
(1) E600Participant Involvement PkgPublic disclosure and consultation documentation, including contact information, documents sent and land/resident/mineral description.26-Oct-20189.45 MB
(1) E600Participant Involvement PkgPublic disclosure and consultation documentation, including contact information, documents sent and land/resident/mineral description.26-Oct-20188.12 MB
(1) E600Participant Involvement PkgPublic disclosure and consultation documentation, including contact information, documents sent and land/resident/mineral description.26-Oct-20184.71 MB
(1) E600Participant Involvement Pkg5.10.2.3A_PI Summary_Landowner Occupant_non-redacted09-Apr-20193.78 MB
(1) E600Participant Involvement PkgPublic disclosure and consultation documentation, including contact information, documents sent and land/resident/mineral description.26-Oct-201882.66 KB
AllSubsequent Information31374 - AER to SemCAMS - Application Decision - 2019-11-0105-Nov-2019399.24 KB
AllSubsequent Information31374 - Pembina to SemCAMS - Subsequent Information - 2018-12-1720-Dec-20181.97 MB
AllSubsequent Information31374 - Pembina to AER - Subsequent Information - 2019-01-1617-Jan-20194.37 MB
(1) E600Miscellaneous (Ext)Confidential *20-Mar-2019990.33 KB
(1) E600Miscellaneous (Ext)Confidential *09-Apr-20197.53 MB
(1) E600Miscellaneous (Ext)Confidential *09-Apr-2019936.01 KB
* This attachment is restricted from public viewing. 

AER Home Page 

Spacing Map

If you have any questions or comments please contact the EAS Administrator.
© Alberta Energy Regulator.