(1) ER Scheme | Application | Application requirements as per Directive 065. | 18-Jun-2015 | 14.21 MB |
(1) ER Scheme | Application Forms | Application documents containing background and technical information for review by the AER. | 18-Jun-2015 | 35.73 KB |
(1) ER Scheme | Approval Area Map | Map showing proposed or existing approval area, location and status of each scheme well, offsetting wells meeting the notification requirements, other ER approval areas in pool, zero edge or isopach map and G-Order boundary for pool | 18-Jun-2015 | 35.03 KB |
(1) ER Scheme | Disposition Document | Approval No. 7526B | 26-Aug-2016 | 643.99 KB |
(1) ER Scheme | Disposition Document | Approval No. 12447 | 26-Aug-2016 | 767.02 KB |
(1) ER Scheme | Isopach Map | Net oil and/or gas pay map. | 18-Jun-2015 | 35.03 KB |
(1) ER Scheme | Letter of Disposition | Letter of Disposition | 26-Aug-2016 | 147.26 KB |
All | Letters of Objection | 30225 - Engelking (Singh) to Penn West - SOC - 2016-04-08 | 11-Apr-2016 | 155.96 KB |
(1) ER Scheme | Miscellaneous | Miscellaneous attachments in support of the application. | 28-Jan-2016 | 1.53 MB |
(1) ER Scheme | Miscellaneous | Miscellaneous attachments in support of the application. | 02-Aug-2016 | 8.02 MB |
(1) ER Scheme | Miscellaneous - Internal | EPZ - 03-04-52-25W4 Well EPZ (revised2) | 08-Feb-2016 | 23.99 KB |
(1) ER Scheme | Miscellaneous - Internal | AOF - 2 december 2015 aof model 03-04-52-25W4_17000 | 08-Feb-2016 | 17.04 KB |
(1) ER Scheme | Miscellaneous - Internal | AOF - 2 december 2015 aof model 03-04-52-25W4_17000 sf to whd | 08-Feb-2016 | 17.34 KB |
(1) ER Scheme | Miscellaneous - Internal | 03-04-052-25W4 bq test | 08-Feb-2016 | 5.78 MB |
(1) ER Scheme | Miscellaneous - Internal | Request for information | 05-Aug-2016 | 5.1 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - Dec 2015 CSV file | 08-Dec-2015 | 25.23 KB |
(1) ER Scheme | Miscellaneous - Internal | Penn West Email Nov 23, 2016 Confirming VRRs and H2S Percentage | 15-Aug-2016 | 684.76 KB |
(1) ER Scheme | Miscellaneous - Internal | Request for information | 20-Jan-2016 | 6.67 KB |
(1) ER Scheme | Miscellaneous - Internal | Email Acceptance of Updated Conditions in Approval | 25-Aug-2016 | 650.78 KB |
(1) ER Scheme | Miscellaneous - Internal | Applicant Email re Revised CSV for Batch File | 08-Feb-2016 | 652.34 KB |
(1) ER Scheme | Miscellaneous - Internal | Email Update PennWest Contact (Feb 26, 2016) | 04-Mar-2016 | 608.8 KB |
(1) ER Scheme | Miscellaneous - Internal | Request for information | 16-Feb-2016 | 6.94 KB |
(1) ER Scheme | Miscellaneous - Internal | Email Update wrt Landowners, Surface Notifications within 350m (Mar 1, 2016) | 04-Mar-2016 | 612.11 KB |
(1) ER Scheme | Miscellaneous - Internal | Sample Notification Package March 2016 | 10-Mar-2016 | 2.92 MB |
(1) ER Scheme | Miscellaneous - Internal | Sample Notification Package March 2016 | 10-Mar-2016 | 2.92 MB |
(1) ER Scheme | Miscellaneous - Internal | Applicant Email re Confirmation of Tubing Size | 08-Feb-2016 | 653.81 KB |
(1) ER Scheme | Miscellaneous - Internal | 03-04 well CSV for Batch - revised3 | 08-Feb-2016 | 25.27 KB |
(1) ER Scheme | Miscellaneous - Internal | Feb 8, 2016 - Applicant Email re Suspension of 03-04 Well and Bow-Tie Risk Analysis | 08-Feb-2016 | 1.16 MB |
(1) ER Scheme | Miscellaneous - Internal | Applicant Email with Updated EPZ and AOF Calculation | 08-Feb-2016 | 6.25 MB |
(1) ER Scheme | Miscellaneous - Internal | 5 february 2016 Risk Analysis. Final. Armisie (2) | 08-Feb-2016 | 605.04 KB |
(1) ER Scheme | Miscellaneous - Internal | Request for information | 05-Aug-2016 | 5.08 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - EPA Additional Questions | 19-Aug-2015 | 29.94 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - Response to EPA Questions for Application No 1832419 (pen01-2045-01) | 19-Aug-2015 | 3.29 MB |
(1) ER Scheme | Miscellaneous - Internal | D71 - Armisie Leduc 2015 ERP Update REVISED 14-Aug-15 | 19-Aug-2015 | 1.41 MB |
(1) ER Scheme | Miscellaneous - Internal | D71 - Attachment 1_2015 PW Armisie Leduc Final W& P 19-Aug-2015 rr and epz calculation | 11-Sep-2015 | 297 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - Attachment 2_AERH2S 2015 Armisie Leduc Wells& Pipes V1.20 19-Aug-2015 | 11-Sep-2015 | 4.36 MB |
(1) ER Scheme | Miscellaneous - Internal | D71 - ARMISIE LEDUC 2015 BATCH - 13-AUG-2015 | 19-Aug-2015 | 56.16 KB |
(1) ER Scheme | Miscellaneous - Internal | WL_0003609_100-03-04-052-25W4-00_2015-06-30_temp log | 12-Aug-2015 | 430.7 KB |
(1) ER Scheme | Miscellaneous - Internal | Request for information | 29-Jun-2015 | 5.38 KB |
(1) ER Scheme | Miscellaneous - Internal | EPA Additional Questions | 29-Jun-2015 | 52.95 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - Armisie_Leduc 2015_ERP Map | 19-Aug-2015 | 1.47 MB |
(1) ER Scheme | Miscellaneous - Internal | Request for information | 12-Aug-2015 | 5.21 KB |
(1) ER Scheme | Miscellaneous - Internal | WL_0003609_00-03-04-052-25W4-00_2015-06-30_Temperature Injection Interpretation | 12-Aug-2015 | 361.51 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - dec 2015 Armisie_Leduc 2015_AER EPZ MAP_ R2 | 08-Dec-2015 | 496.2 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - december 8 2015 sir#6 submission 03-04-52-25W4 Well EPZ | 08-Dec-2015 | 23.99 KB |
(1) ER Scheme | Miscellaneous - Internal | Request for information | 22-Jul-2016 | 5.09 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - 8 december 2015 sir#6 updated D71 - EPA Additional Questions to be Answered and attachments | 08-Dec-2015 | 633.31 KB |
(1) ER Scheme | Miscellaneous - Internal | D71 - 10 september 2015 sir#4 epa and response # 1832419 pen01-2045-01 | 11-Sep-2015 | 1.05 MB |
(1) ER Scheme | Miscellaneous - Internal | Acceptance of Annual Pressure Survey Schedule | 11-Sep-2015 | 697.99 KB |
(1) ER Scheme | Miscellaneous - Internal | Email response to Penn West Application 1832419 (pen01-2045-01) | 26-Oct-2015 | 607.86 KB |
(1) ER Scheme | Miscellaneous - Internal | Request for information | 14-Oct-2015 | 5.36 KB |
(1) ER Scheme | Pressure Data and Interpretatn | Measured or estimated reservoir pressures for the scheme area, the source of the data, and a discussion of how the pressure data relates to and supports the scheme operations | 18-Jun-2015 | 35.03 KB |
(1) ER Scheme | PVT Data | Pressure/volume/temperature properties of the reservoir fluid, source of the PVT data, and pressure data (including initial, bubble point, current and proposed operating pressures) | 18-Jun-2015 | 35.03 KB |
(1) ER Scheme | Reserves Data | Initial oil and gas volume in place for the scheme, oil and gas recovery factors (existing and proposed depletion mechanisms), recoverable oil and gas reserves and a description of the methods used in determining the estimates. | 18-Jun-2015 | 35.03 KB |
(1) ER Scheme | Well Log(s) | An interpreted and annotated log cross section or an annotated log of a well representative of the subject pool. | 18-Jun-2015 | 35.03 KB |