Enter the following surface impact information:
|
1. |
The AER water body setback requirements have been met |
Select Yes to show that the well will meet the water body setback requirements (Directive 056, Section 7.10.12.1), or that there is no water body within 100 m of the well centre. Select No to show that due to exceptional circumstances, the requirements have not been met. You must include the following Water Body Protection attachment. If the proposed well is a Category E well and is located within 100 m of a water body, you must also include this attachment.
|
||||||||||||
|
1a. |
All other AER setback requirements have been met |
Select Yes to show that the proposed well will meet all applicable surface improvement setback requirements outlined in Directive 056, Sections 7.10.12.2 to 7.10.12.5. Select No if
You must include the following Other Setbacks attachment. If the proposed well is a Category E well and is located within 100 m of a surface improvement, you must also include this attachment:
|
||||||||||||
|
2. |
The proposed well site and/or access road will meet AER environmental requirements |
Select Yes to show that the proposed well site or access road will meet all applicable environmental requirements stated in Directive 056, Section 7.9.13. Select No if the well will be located within the Eastern Slopes Area defined by IL93-09, or if due to exceptional circumstances, all applicable requirements as cited above have not been met. You must attach:
For Category E wells, you must attach:
|
||||||||||||
|
3. |
The proposed well site requires Historical Resources Act clearance |
Select Yes to show that proposed well site requires clearance by Alberta Community Development (ACD), in accordance with the Historical Resources Act. Select No to show that the proposed well site does not require clearance by ACD. |
||||||||||||
|
3a. |
If Yes, Alberta Community Development has granted clearance for the well site |
Select Yes to show that Alberta Community Development has granted clearance for the proposed well site. Select No if the clearance has not been granted. You must attach:
For both Yes and No answers for Category E wells, you must attach:
|